Skip to the main content
The Crier

Dometic Heating Systems Online survey

Your saved contracts

What the buyer wrote

Policy Background and Aims of Boiler Plus project The Boiler Plus project is looking at ways of reducing emissions from domestic gas central heating systems. We are exploring policy options for revising Building Regulations to update minimum standards on the energy efficiency of boilers and heating controls. For example, when a household replaces their old boiler, there may be a requirement for all new boilers installed to meet a set energy efficiency standard, and for the heating system to include a minimum package of controls (e.g. a central programmer, room thermostat and Thermostatic Radiator Valves (TRVs)). A wide range of different boiler technologies and heating controls are av…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

TNS-BMRB£18.9kends (16 May 2016)

Details

What the buyer calls it
Dometic Heating Systems Online survey
How they are buying
The buyer did not say
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
17 Mar 2016
Work ends
16 May 2016

Who the buyer named

The buyer published a contact address on this notice.

James.Steel@decc.gsi.gov.uk