DR Suite Cooler Unit – Broomfield HospitalServices
What the buyer wrote
MEHT wishes to receive tenders for the design, manufacture, supply, delivery to site, off-loading, moving to place of work, protecting, assembly, installation, testing and commissioning of DR Suite Cooling Unit at Broomfield Hospital. As part of a programme of works aimed at building extra resilience into the Disaster Recovery (DR) computing centre at Broomfield Hospital the DR management team has identified the need for a dedicated chilled water installation that is suitable for supplying the needs of fan coil units fitted inside the DR computer suite. The new system will be connected into existing flow and return pipe work in such a way that cooling can be provided by either the new c…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- DR Suite Cooler Unit – Broomfield HospitalServices
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 18 Jan 2016
- Work ends
- 31 May 2018
Who the buyer named
Vicky Bevan was the named contact on this notice.
