Asbestos Refurbishment /demolition survey The scope of works to to be undertaken in accordance with strict HSE guidelines - and to include: Works to include all building fabric and services installations. Ensure all areas are made safe prior to works commencing. A. Management Survey (formerly Type 1 or 2 Asbestos Survey) Visual survey, local, identify and tag. This is a re-visit and audit of retained documentation/asbestos register, to ensure it is accurate and the risks within the building are known to all operatives. B. Refurbishment/Pre-demolition Survey (formerly Type 3 Asbestos Survey) Make safe and remove deleterious materials under controlled conditions. …
Details
- What the buyer calls it
- DR5061 Asbestos / Measured Surveys (Civic Centre)
- How they are buying
- The buyer did not say
- Type
- services
- Work starts
- 5 May 2016
- Work ends
- 6 Jun 2016