Skip to the main content
The Crier

East Row - Installation of New Footbridge

Your saved contracts

What the buyer wrote

Installation of a new FRP footbridge complete with parapet system supplied by the client. The construction of the two concrete abutments and ramps and fencing associated with joining the existing footpaths on either side of the river. Removing surfacing on east side of existing road bridge and replacing with granite setts, preparing and painting parapet. East Row, Sandsend carries the A174 over East Row Beck, approximately 5km north of Whitby. The new footbridge is to be sited approximately 10m downstream of East Row Road Bridge. The area is a designated Conservation Area.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hall Construction Services£49kends (13 Mar 2017)

Details

What the buyer calls it
East Row - Installation of New Footbridge
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
13 Feb 2017
Work ends
13 Mar 2017

Who the buyer named

Alison Dickinson was the named contact on this notice.

alison.dickinson@northyorks.gov.uk