What the buyer wrote
s part of the Eastern Green Link 2 (EGL2) project, a new connection will increase the capability of the electricity transmission network between England and Scotland. Scottish Hydro Electric Transmission PLC and National Grid Electricity Transmission PLC are partnering on the project. Prior to the EPC offshore installation works commencing, a UXO ALARP certificate needs to be produced which is specific to the installation corridor and demonstrates industry best practice for UXO management and mitigation. The general requirement is for a marine UXO survey along an approximately 440km route from Peterhead in Scotland to near Bridlington, England over an 80m wide corridor
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- EGL 2 UXO Marine Survey
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Kind of work
- Architecture, engineering and surveying
Who the buyer named
Rachel Babb was the named contact on this notice.
