Skip to the main content
The Crier

EGL 3 & 4 Marine Surveys

Your saved contracts

What the buyer wrote

As part of the Eastern Green Link Projects (EGL 3 & EGL 4) new connections will increase the capability of the electricity transmission network between England and Scotland. The general requirement is for a marine survey of two cable routes to inform of seabed morphology and shallow sediment structure, and to provide benthic characterisation and habitat maps. The planned marine cable routes are both East Coast UK, from Peterhead to Lincolnshire and from Fife to Lincolnshire. Lotting of the Requirements: • Lot 1- EGL 3 Marine Cable Route Survey: approximately 500 km route from Peterhead to Lincolnshire • Lot 2 - EGL 4 Marine Cable Route Survey: approximately 450 km route from Fife to Linco…

Read all of it on Find a Tender →

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
EGL 3 & 4 Marine Surveys
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
services
Lots
2

Who the buyer named

Rachel Babb was the named contact on this notice.

rachel.babb@nationalgrid.com