Skip to the main content
The Crier

Elecricity Cabling from Supply End to Usage Locations at Hatfield Moors NNR

Your saved contracts

What the buyer wrote

To provide the necessary works and materials to connect from the Northern Power Grid supply at Canberra Compound on Hatfield Moors (the new supply location) to the two locations as shown on the attached map. The two locations are 424m and 63m away from the supply location. To install the required facility to run lights and heaters at location 1. To install lights and sockets at location 2. To additionally install lights at a possible location 3 – dependant on budget following a quote for compost toilet blocks and whether we can afford one or two blocks. We anticipate being in a position to confirm this at contract award stage.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Lytollis Engineering Ltd£18.9kends (31 Mar 2015)

Details

What the buyer calls it
Elecricity Cabling from Supply End to Usage Locations at Hatfield Moors NNR
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
9 Mar 2015
Work ends
31 Mar 2015

Who the buyer named

Emma Roberts was the named contact on this notice.

emisk@cefas.co.uk