What the buyer wrote
he scope of this contract shall, where applicable, include the complete and all design for the installation. The design, supply and installation of the new lift components detailed in this specification. The design shall include, design drawings, contract drawings and record drawings, and all other information required by members of the professional team to allow proper integration of the installations within the building, including the provision of information and comments for the scheme design, required by building control. All labour, materials, tools and equipment required for the supply of and installation of the new lift installation detailed in this specification and for the testing, …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- ELFT Alie Street Lifts Refurbishment
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Work starts
- 16 Sep 2025
- Work ends
- 2 Feb 2026
- Where
- in London
- Kind of work
- Refurbishment and fit-out
Who the buyer named
Stevie-Jay Cavanagh was the named contact on this notice.