Enabling Magnetic Track Brakes on Network Rail Contolled Infrastructure
What the buyer wrote
The project objective is to deliver a detailed feasibility assessment of MTB deployment on the GB mainline network, considering technical compatibility, application scenario and cost-benefit analysis. The findings will inform: • The content of the proposed Railway Group Standard on MTB for use in emergency (proposal 14/044). • Discussion and decision by TOCs and NR routes on the suitability of MTB deployment for specific opportunities with specific fleets on specific routes. • Cross-industry discussion and decision on whether it would be feasible and worth pursuing ‘non-emergency use’ of MTB. The first two bullet points above are expected to deliver safety and performance improvem…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Enabling Magnetic Track Brakes on Network Rail Contolled Infrastructure
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Dec 2015
- Work ends
- 3 Jun 2016
Who the buyer named
Vikram Singh Gudra was the named contact on this notice.
