What the buyer wrote
The Science Museum Group (SMG) requires a Contractor to undertake works to the level 2 London Science City Gallery in the East Wing of the Museum. The works will entail the demolition and strip out of the Level 2 Journeys Through Medicine and Energy galleries in preparation for their fit out as the new London Science City gallery. The demolition and strip out includes removal of existing display cases, setworks, flooring, lighting and suspended ceilings and a full asbestos survey and removal as necessary.
Details
- What the buyer calls it
- Enabling Works Package for London Science City
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 13 Sep 2018
- Work ends
- 30 Nov 2018
Who the buyer named
Jamie Taylor was the named contact on this notice.
