Environment Agency: Cley Floodwall Access Improvements

Your saved contracts

What the buyer wrote

Recycled Plastic for Access Boardwalk. The 1.2m wide Boardwalk will be approximately 215 metres long with a handrail (with FSC Approved Softwood rails) on one side mostly and our design estimates the following quantities of materials below will be required. We have included generous allowances for surplus materials in the estimates as ground conditions do vary. The design is based on using recycled lumber and low slip potential boards as it will be in an intertidal zone. The boardwalk level will be above the normal tidal range and should not be covered. The design includes 3 stringer rails sat on bearers attached to 100mm x 100mm posts. Stainless Steel fixings are to be used. Ma…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Environment Agency: Cley Floodwall Access Improvements
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
14 Feb 2020
Work ends
31 Mar 2020
Kind of work
Construction