Skip to the main content
The Crier

Esholt Village Surface Water Flood Alleviation Scheme

Your saved contracts

What the buyer wrote

The project aims to alleviate surface water flooding in the village of Esholt. The most recent flooding was in February 2020 and prior to that extensive flooding occurred in December 2015. The scheme will protect 19 properties located within the centre of the village as well as a single property on Church Lane. The works involve intercepting the existing watercourse through the village and diverting it down Chapel Lane in a new piped system, which will outfall direct to the river Aire, as shown in the scheme drawings

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Peter Duffy Limited£250kends (26 Feb 2021)

Details

What the buyer calls it
Esholt Village Surface Water Flood Alleviation Scheme
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
26 Oct 2020
Work ends
26 Feb 2021

Who the buyer named

Kevin Foulstone was the named contact on this notice.

support@due-north.com