ETE7566 – Detailed Design Studies For Flood Alleviation Scheme
What the buyer wrote
The Consultant is required to produce Outputs for the Detailed Design Works for the Renishaw Flood Alleviation Scheme, Derwent Grove, Alfreton Flood Alleviation Scheme and Scropton Flood Alleviation Scheme. The Outputs of the Detailed Design Works must be sufficient for the Employer to progress each scheme to the construction phase. The Employers intention is to procure the construction of the agreed Detailed Design Works through the Midlands Highway Alliance (MHA) Additional information: Please find all tender documentation for this opportunity on the Due North Tendering Portal
Details
- What the buyer calls it
- ETE7566 – Detailed Design Studies For Flood Alleviation Scheme
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Feb 2016
- Work ends
- 22 Jul 2016
- Kind of work
- New build construction
Who the buyer named
Peter Towndrow was the named contact on this notice.
