Skip to the main content
The Crier

Extension of the Blackpool & Fleetwood Tramway from North Pier to North Station

Your saved contracts

What the buyer wrote

The Contracting Authority wish to undertake an extension of the Blackpool and Fleetwood Tramway from NorthPier to a terminus adjacent to Blackpool North Railway Station. Detailed design and construction of:- a) approx 550m of twin track, crossings, turnouts, drainage, ducts and trackbed, together with connections of the existing tramway track; b)tram stops; c)association highway works; d) the reconstruction of Talbot Square; e)the reconstruction of highway junctions; f) the OLE and associated electrical supply and control infrastructure; g) earthing and bonding. (\"The Works\")

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

John Sisk & Son (Holdings) Limited£10mends (1 Apr 2019)

Details

What the buyer calls it
Extension of the Blackpool & Fleetwood Tramway from North Pier to North Station
How they are buying
Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
Type
works
Work starts
1 Dec 2017
Work ends
1 Apr 2019

Who the buyer named

The buyer published a contact address on this notice.

FTSprocurementnotices@blackpool.gov.uk