What the buyer wrote
Drainage and Footpath Construction Falling Foss - Cut back overhanging branches to prepare site and access route Provide public safety signs and cordon off areas as appropriate 500 linear metres of ditching - leave arisings on site Scrap path to solid ground Piped crossings placed at regular intervals under path - crossings should be humped to take surface water off path Prepare beck crossing with measures to minimise sediment entering beck and restore on completion Stone tipped at car park and transported to site in appropriate size dumpers Whinstone type 1 laid to compacted depth of100mm and 1.5m wide along 400 linear meters Maybeck - Prepare access route Excavate existing cro…
Details
- What the buyer calls it
- Falling Foss Footpath Improvements
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 27 Nov 2017
- Work ends
- 30 Mar 2018
Who the buyer named
Mags Waughman was the named contact on this notice.