Skip to the main content
The Crier

Fault Study

Your saved contracts

What the buyer wrote

A Fault Study is required in order that STSC Ltd can determine the present capacity of the site distribution network. The tenderer is required to develop a computer model of the distribution network in its current form. The model should provide STSC information on fault levels, what potential loads can be supplied at various locations throughout the site, the arc flash level for operators of the equipment and the effect on capacity if parts of the network are removed. STSC also requires the model to be adaptable and for the tenderer to be able to produce the same information requested above when asked to introduce different loads and network configurations.

Details

What the buyer calls it
Fault Study
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
17 Sep 2017
Work ends
17 Sep 2019

Who the buyer named

The buyer published a contact address on this notice.

procurement@stscltd.co.uk