Skip to the main content
The Crier

Fleet Air Arm Museum, Somerset, Bridge Repair.

Your saved contracts

What the buyer wrote

Normal access to the Fleet Air Arm Museum is via a set of stairs that lead to a bridge structure over a road on the Naval Air Station below, those unable to climb the stairs enter through a ground level gate. This staircase and bridge have been in use for many years and are now in need of refurbishment and updating. Some years ago a second set of stairs that used to serve the bridge were removed and this has consequently altered the loading on the stairs and bridge. With this in mind a structural survey (2015 report, appendix 2) of the stairs and bridge had been carried out and recommendations made to repair, make good, the bridge structure. The existing bridge and stairs require ma…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Fleet Air Arm Museum, Somerset, Bridge Repair.
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
1 Nov 2018
Work ends
21 Dec 2018

Who the buyer named

The buyer published a contact address on this notice.

hst.procurement@nmrn.org.uk