Skip to the main content
The Crier

Forestry England - Whinlatter Hydroelectric Power Scheme

Your saved contracts

What the buyer wrote

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre and into Thornthwaite, for export to the National Grid. Detailed design is currently in progress for the overall scheme with the turbine specification and requirements set o…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Forestry England - Whinlatter Hydroelectric Power Scheme
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
24 May 2020
Work ends
24 May 2025

Who the buyer named

Jeni West was the named contact on this notice.

jeni.west@forestry.gsi.gov.uk