Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry
Gateshead Councilworks
What the buyer wrote
The framework is for the design, construction/installation and subsequent operation (including maintenance and back office support) of EV charging units primarily for the taxi trade. NECA have secured monies from The Office for Low Emission Vehicles Taxi Infrastructure fund which will be used to fund the upfront 75% of the capital costs of each EV Charging Unit associated with the design and build element of the Call-Off Contract (including the Actual Connection Fee charged by the relevant utility supplier to connect the EV Charging Unit to the power grid). The Contractor will fund 25% of the capital costs of each EV Charging Unit plus the ongoing operation and maintenance of each of the …
Details
- What the buyer calls it
- Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 3 Dec 2019
- Work ends
- 2 Dec 2021
Who the buyer named
Ruth Carr was the named contact on this notice.