Skip to the main content
The Crier

Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry

Your saved contracts

What the buyer wrote

The framework is for the design, construction/installation and subsequent operation (including maintenance and back office support) of EV charging units primarily for the taxi trade. NECA have secured monies from The Office for Low Emission Vehicles Taxi Infrastructure fund which will be used to fund the upfront 75% of the capital costs of each EV Charging Unit associated with the design and build element of the Call-Off Contract (including the Actual Connection Fee charged by the relevant utility supplier to connect the EV Charging Unit to the power grid). The Contractor will fund 25% of the capital costs of each EV Charging Unit plus the ongoing operation and maintenance of each of the …

Read all of it on Contracts Finder →

Details

What the buyer calls it
Framework for the Provision, Installation, Operation and Maintenance of Electric Vehicle Charging Units for the Taxi Industry
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
3 Dec 2019
Work ends
2 Dec 2021

Who the buyer named

Ruth Carr was the named contact on this notice.

ruthcarr@gateshead.gov.uk