Further Competition under ESPO Framework Agreement No. 256_16, Lot L2
What the buyer wrote
The work to be carried out is detailed below: - • Collect all necessary equipment (pole bracket, box with cut-out, pre wired LED lanterns and CMS nodes) from Mountsorrel Depot or Croft Depot • Provide basic layout Traffic Management as required by "ADDENDUM TO APPENDIX 1/17 TRAFFIC SAFETY AND MANAGEMENT" • Disconnect existing EME overhead pole brackets for transfer to new equipment. • Take down and remove to customers skips in Mountsorrel depot existing O/H pole bracket, box, cable and lantern. • Install new free issue pole bracket, box, cut-out, LED lantern (0° Tilt) and CMS node no more than 6m above ground level and no less than 1.3m from pole terminals.(In general the new lanterns …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Further Competition under ESPO Framework Agreement No. 256_16, Lot L2
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Dec 2017
- Work ends
- 31 Aug 2018
Who the buyer named
Ms Caroline Dickens was the named contact on this notice.
