GB-Bristol: Provision of Hydraulic Mooring Capstan & Hydraulic High Pressure Power Pack
What the buyer wrote
The UK MOD’s Salvage and Marine Operations team (SALMO) have a requirement to procure a Hydraulic Mooring Capstan and a compatible Hydraulic High Pressure Power Pack. The ship deployable Deep Water Mooring System (DWMS) capability was acquired by SALMO at the request of Navy Command to provide the UK’s MOD with the capability to moor vessels of up to 18000 Tonnes Displacement in deepwater (depths of up to 3000 meters) worldwide for a minimum of 30 days in up to Sea State 8 conditions. The DWMS is designed to be deployed into or recovered from the sea utilising a vessel of opportunity (an unspecified vessel to be chartered when necessary). The intention is to procure a 25T Hydraulic Cap…
Details
- What the buyer calls it
- GB-Bristol: Provision of Hydraulic Mooring Capstan & Hydraulic High Pressure Power Pack
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 29 Sep 2015
- Work ends
- 31 Mar 2016
Who the buyer named
Mr Daniel Britton was the named contact on this notice.
