GB-Chertsey: Cost Advisor for the Resilience, Capacity and Sustainability of the Electrical Distribution System Project
What the buyer wrote
The project is to reduce the risk of power failures affecting the business continuity of the Trust at St Peter’s Hospital. The project further encompasses future anticipated capacity/demand of the electrical system to provide effective 100% standby generator back-up by 2017. Use of the national grid and generators are to be sustainable, by providing assurance of high efficiency continuing supplies for a minimum of 15 years (i.e. 2033). The Consultant will act as Cost Consultant/Advisor/QS. There will be separately appointed Lead Consultant, Principal Designer and Project Manager, and the Trust’s Authorising Engineer (AE) will peer review the Lead Consultant’s proposals. The Cost Consulta…
Details
- What the buyer calls it
- GB-Chertsey: Cost Advisor for the Resilience, Capacity and Sustainability of the Electrical Distribution System Project
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Work starts
- 3 Jan 2017
- Work ends
- 31 Mar 2017
Who the buyer named
Melvyn Lake was the named contact on this notice.