Skip to the main content
The Crier

GB-Colchester: Creation of High Street Designs

Your saved contracts

What the buyer wrote

As an enhancement to the streetscape improvement works being undertaken by ECC Highways on the 3 High St alleyways (Bank Passage, Pelham’s Lane, St Nicholas Passage) using LEP Growth funding, this BIFA project will deliver a range of wrought ironwork overthrow installations at the entrances to the alleyways that will provide both an interpretation of the heritage of the area as well as create attractive features for visitors to the town to enjoy. The Wrought Ironwork must be manufactured as detailed below and finished as follows: •The Finish shall be a Two pack MIO (Micaceous Iron Oxide) •Anti-rust treatment: Hot Zinc dipped or Hot Zinc Spray (no need to etch). •Fabrication to latest B…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Designs on Metal£38kends (30 Jun 2016)

Details

What the buyer calls it
GB-Colchester: Creation of High Street Designs
How they are buying
The buyer did not say
Type
goods
Work starts
24 Apr 2016
Work ends
30 Jun 2016

Who the buyer named

Matt Howe was the named contact on this notice.

procurement@colchester.gov.uk