What the buyer wrote
As an enhancement to the streetscape improvement works being undertaken by ECC Highways on the 3 High St alleyways (Bank Passage, Pelham’s Lane, St Nicholas Passage) using LEP Growth funding, this BIFA project will deliver a range of wrought ironwork overthrow installations at the entrances to the alleyways that will provide both an interpretation of the heritage of the area as well as create attractive features for visitors to the town to enjoy. The Wrought Ironwork must be manufactured as detailed below and finished as follows: •The Finish shall be a Two pack MIO (Micaceous Iron Oxide) •Anti-rust treatment: Hot Zinc dipped or Hot Zinc Spray (no need to etch). •Fabrication to latest B…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- GB-Colchester: Creation of High Street Designs
- How they are buying
- The buyer did not say
- Type
- goods
- Work starts
- 24 Apr 2016
- Work ends
- 30 Jun 2016
- Kind of work
- Roofing, windows and building fabric
Who the buyer named
Matt Howe was the named contact on this notice.
