Skip to the main content
The Crier

GB-Deeside: Design, Supply & Installation of Temperature Controlled Laboratory

Your saved contracts

What the buyer wrote

The projects aim is to design and build a showcase standard, self-contained, mechanical calibration laboratory within the current production area. This will enable the environment to be controlled independently of the main workshop with the desired level of control. This laboratory is to be designed to offer an impressive, innovative showcase facility. The room is to be built with a containment area of approximately 432m2 of internal workshop space, floor to ceiling to enclose permanently fixed machinery. Additional information: To view this notice, register as a supplier here: http://www.contracts.mod.uk/delta/signup.html?userType=supplier and searc…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Cleanroom Design & Construction£141.2kends (29 Dec 2017)

Details

What the buyer calls it
GB-Deeside: Design, Supply & Installation of Temperature Controlled Laboratory
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Work starts
2 Jul 2017
Work ends
29 Dec 2017

Who the buyer named

Linda Sandoz was the named contact on this notice.

linda.sandoz@deca.mod.uk