GB-Edinburgh: Common Marine Inspection Document & Failure Mode Effect Analysis
What the buyer wrote
The General Lighthouse Authorities have a requirement covering Common Marine inspection Document (CMID) and Failure Mode Effect Anslysis (FMEA) trials for the following vessels NLV Pharos, NLV Pole Star, Granuaile and THV Galatea. Locations will be agreed with the successful contractor(s) as these will vary for each vessel but will cover teh UK Mainland and North or South Ireland. The contract period will cover three (3) years. There is an option to include an additional two vessels during the contract period. Full details of the requireents are detailed within the tender document. Additional information: The contracting authority considers that this contract may be suitable for economic…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- GB-Edinburgh: Common Marine Inspection Document & Failure Mode Effect Analysis
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Work starts
- 23 Mar 2015
- Work ends
- 31 Aug 2017
- Kind of work
- Architecture, engineering and surveying
Who the buyer named
John Marr was the named contact on this notice.
