What the buyer wrote
Construction of Portain Beacon - Description of Works It is proposed to construct a 10.5m high structure with a 3 mile nautical light positioned a minimum of 6m above mean high water springs to replace the existing Portain Buoy. The structure will be coloured predominantly green to act as a day mark and a ladder is to be provided from mean low water level to the working platform to allow for safe access during future maintenance visits and inspections. A 4m high cylindrical gravity concrete base foundation will be formed directly onto the bedrock using 3.0m Ø precast concrete manhole rings as permanent formwork which will be filled with marine grade underwater concrete…
Details
- What the buyer calls it
- GB-Edinburgh: Construction of Portain Beacon
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 16 Nov 2020
- Work ends
- 31 Mar 2021
- Kind of work
- Transport and fleet, New build construction
Who the buyer named
Steven Carvel was the named contact on this notice.
