What the buyer wrote
NLV Pole Star requires work to carried out in Leith Docks, Edinburgh during the period 11-29 September 2017 on their TTS crane as per the following summary of scope of works: (1) Remove and replace all outer slew bolts. (2) Tightening checks of inner bolts. (3) Hydraulic hose and fitting replacement (4) Electrical survey and urgent remedial repairs if required. (5) Replace Winch mounting frame bolts. (6) Overhaul of Port Main Winches. (7) Replacement of one Slew motor complete (gearbox & hydraulic Motor) (8) Replacement of hydraulic filter and filter indicator. Additional information: The contracting authority considers that…
Details
- What the buyer calls it
- GB-Edinburgh: Main Crane Overhaul
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 10 Sep 2017
- Work ends
- 29 Sep 2017
Who the buyer named
Neil Brown, Procurement Administrator was the named contact on this notice.
