What the buyer wrote

The following gives an outline description of the works: Stage 1 - Carry out a conditional survey of each mast including all fixings, connections, guys ropes and anchorage point and then report on the suitability of the masts in their current condition. Stage 2 - Disconnect top antenna wires running between all three masts. This work must be undertaken by a competent nominated antenna contractor. The removal of the antenna wires shall allow NLB Staff to undertake tuning tests to establish whether the station can be run using only the central mast. The outcome of the works at this stage shall determine the scope and timescales for further works, there are three possible options as listed…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Zenith Structural Access Solutions Limited£91.8kends (8 Dec 2016)

Details

What the buyer calls it
GB-Edinburgh: Refurbishment of DGPS Masts - Earls Hill
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
31 Oct 2016
Work ends
8 Dec 2016