GB-Helensburgh: Pipeline Painting F76 Jetty Area including manifolds incorporating industrial scaffolding OFD Garelochhead
What the buyer wrote
A need has been identified at our Oil & Fuel Depot (OFD) Garelochhead to improve the paint coatings applied to the F76 and line 3 sections of pipeline in 3 key manifolds and the jetty approach and head up to loading arm, and a manifold at the white oils (zones M & K). The conclusion of a combined inspection in these zones are that, in general the sections of pipeline are in good condition overall, however there are a number of minor and medium areas of surface corrosion resultant from moisture entrapment and coating breakdown predominantly along the fuelling jetty and within valve pits. These sections are mostly within 3 manifolds (deemed as medium risk confined space) and the jetty approach…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- GB-Helensburgh: Pipeline Painting F76 Jetty Area including manifolds incorporating industrial scaffolding OFD Garelochhead
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 18 Feb 2019
- Work ends
- 19 Apr 2019
- Kind of work
- Roofing, windows and building fabric
Who the buyer named
Karen Robinson was the named contact on this notice.
