GB-High Wycombe: Hatters Lane- retaining wall

Your saved contracts

What the buyer wrote

The masonry wall façade exhibits signs of movement with vertical cracks and bulging/leaning of the structure , existing wall requires re-stabilisation via earth anchors (Platipus earth anchoring system or equivalent) , to be installed through the masonry structure tying it back to the ground behind. Bed joint repair and strengthening is required locally to the installation of earth anchors and sections of wall require rebuilding and repair to also include bed joint strengthening. Potential contractors must be able to demonstrate previous experience of installing earth anchoring systems.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Churchman Fenner & Brown Ltd£53kends (7 Jul 2017)

Details

What the buyer calls it
GB-High Wycombe: Hatters Lane- retaining wall
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
14 May 2017
Work ends
7 Jul 2017

Who the buyer named

Steve Middleton was the named contact on this notice.