GB-Leeds: Facilities Directorate

Your saved contracts

What the buyer wrote

The project comprises of Mechanical upgrades to Devonshire Hall North Lawns Blocks F, G, and J. All blocks require boiler and ventilation upgrades, each block has 7 kitchen areas with a boiler in each. Block F requires 4 boilers to be changed, blocks G and J require 7 boilers in each block to be upgraded. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Herbert T Forrest Ltd£195kends (5 Sep 2017)

Details

What the buyer calls it
GB-Leeds: Facilities Directorate
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
23 Aug 2017
Work ends
5 Sep 2017

Who the buyer named

Ben Waters was the named contact on this notice.