Skip to the main content
The Crier

GB-Leeds: Z/3783 SCAPE 2.01 - Lab Cooling

Your saved contracts

What the buyer wrote

Lab 2.01 experiences temperature fluctuations due mainly to the solar and the appliance heat gains. Lab temperatures should be maintained at 21⁰C (comfort cooling control conditions) in line with the UoL space heating and cooling policy and the energy management policy. Initial proposals are to manage the heat gains with a split type "DX" cooling system. Fan coils will be installed within the lab and refrigerant pipe work will connect the indoor units to the outdoor condensing unit(s). The outdoor unit will be positioned on a lower mezzanine flat roof. Additional information: The contracting authority considers that this contract may be suitable for economic…

Read all of it on Contracts Finder →

Details

What the buyer calls it
GB-Leeds: Z/3783 SCAPE 2.01 - Lab Cooling
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
30 Apr 2020
Work ends
30 Jun 2020

Who the buyer named

Ben Waters was the named contact on this notice.

a.b.waters@leeds.ac.uk