What the buyer wrote
Lab 2.01 experiences temperature fluctuations due mainly to the solar and the appliance heat gains. Lab temperatures should be maintained at 21⁰C (comfort cooling control conditions) in line with the UoL space heating and cooling policy and the energy management policy. Initial proposals are to manage the heat gains with a split type "DX" cooling system. Fan coils will be installed within the lab and refrigerant pipe work will connect the indoor units to the outdoor condensing unit(s). The outdoor unit will be positioned on a lower mezzanine flat roof. Additional information: The contracting authority considers that this contract may be suitable for economic…
Details
- What the buyer calls it
- GB-Leeds: Z/3783 SCAPE 2.01 - Lab Cooling
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Apr 2020
- Work ends
- 30 Jun 2020
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
Ben Waters was the named contact on this notice.
