GB-London: OPA T380 OFD Loch Striven - ROSOV & Platform Installation Works - (Tank 7)
What the buyer wrote
As a part of futureproofing and improving the tank overfill protection at Loch Striven, it is required to replace the tank-side issue & receipt manual gate valve with an actuated valve and complete some platform modification works to enhance the practicality of operating the asset. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Details
- What the buyer calls it
- GB-London: OPA T380 OFD Loch Striven - ROSOV & Platform Installation Works - (Tank 7)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 11 Jan 2021
- Work ends
- 31 Mar 2021
- Kind of work
- Construction
Who the buyer named
Karen Robinson was the named contact on this notice.
