GB-Lowestoft: Cycle Bridge Design Project *Duplicated*

Your saved contracts

What the buyer wrote

A design in principle was completed by Sustrans in a previous Feasibility Report completed by them in April 2017. A preferred option was identified in that Feasibility Report which would enable crossing of all abilities on bicycles, pedestrians and pushchairs, to the east of the existing Network Rail footbridge. The design now requires further work and completion to enable Waveney District Council to become Planning Ready.As part of the vision in the Area Action Plan (AAP) it is highlighted that the need to reduce the impact of car travel through improved or new connections for walking and cycling provision. The existing footbridge at Constable Close is only a footbridge and is not Equaliti…

Read all of it on Contracts Finder →

Details

What the buyer calls it
GB-Lowestoft: Cycle Bridge Design Project *Duplicated*
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Work starts
30 Jun 2018
Work ends
21 Dec 2018

Who the buyer named

samantha.cook was the named contact on this notice.