GB-Poole: DH366 Alderney Hospital Replacement Boiler Plant Jersey Ward
What the buyer wrote
Electrical isolation of the boilerplant and strip out of its electrical services back to the control panel Isolation of the boiler gas supply Summer strip out of the existing boilerplant including most of the LPHW services in the plantroom, local gas supply pipework and the boiler flues and flue header Installation of temporary power supplies for the two hot water generators, the HWS secondary pump and the associated instrumentation and the new gas safety shut-off valve Installation of a circular sheet steel protector to the 152 x 152 building column Extension of the boiler concrete base Installation of a stainless steel flashing plate for the boiler flues replacing the wired glass…
Details
- What the buyer calls it
- GB-Poole: DH366 Alderney Hospital Replacement Boiler Plant Jersey Ward
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 29 Jun 2016
- Work ends
- 31 Aug 2016
Who the buyer named
Sureya Hart Senior Contract Manager was the named contact on this notice.
