GB-Poole: New Electrical Intake Room at Yeatman Hospital, Sherbourne
What the buyer wrote
Demolition and clearance of existing smoke shelter, removal and clearance of plant growth to create to footpath. Groundwork / foundation preparation. Construction of sub-structure. Supply and fix new cavity walls. Extend top of existing external walls and extend to same height as cavity walls.Supply and fit new flat roof, including flashings and alterations to rainwater system. Supply and fix external door. Supply and fix floated concrete floor and epoxy floor paint. Undercoat and top coat to walls. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of ten…
Details
- What the buyer calls it
- GB-Poole: New Electrical Intake Room at Yeatman Hospital, Sherbourne
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Aug 2016
- Work ends
- 30 Sep 2016
- Kind of work
- New build construction, Civil engineering and groundworks
Who the buyer named
David Barratt was the named contact on this notice.
