What the buyer wrote

Demolition and clearance of existing smoke shelter, removal and clearance of plant growth to create to footpath. Groundwork / foundation preparation. Construction of sub-structure. Supply and fix new cavity walls. Extend top of existing external walls and extend to same height as cavity walls.Supply and fit new flat roof, including flashings and alterations to rainwater system. Supply and fix external door. Supply and fix floated concrete floor and epoxy floor paint. Undercoat and top coat to walls. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of ten…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

G. R. Westbuild Ltd.ends (30 Sep 2016)

Details

What the buyer calls it
GB-Poole: New Electrical Intake Room at Yeatman Hospital, Sherbourne
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
31 Aug 2016
Work ends
30 Sep 2016

Who the buyer named

Sureya Hart Senior Contract Manager was the named contact on this notice.