The hospital has a single 11kV 400kVA transformer sub-station supplying electrical power to the site via the adjacent main switchroom. The main Hospital LV switchboard is to be replaced with a higher rated switchboard having full automatic standby generator support, additional outgoing circuits and incorporating the existing SSE metering for the incoming supply and new metering for all main outgoing circuits to the buildings. The Hospital has many critical loads and hence the replacement of the LV switchboard is to be carried out in a controlled exercise, one outgoing supply at a time, with the installation of a temporary main switchboard supported from two temporary 400kVA standby ge…
Details
- What the buyer calls it
- GB-Poole: St Ann's Hospital
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 21 Aug 2016
- Work ends
- 5 Sep 2016
- Kind of work
- New build construction