GB-Swanage: Demolition of Everest Building at Swanage Hospital
What the buyer wrote
Demolition shall include for the total removal of existing buildings as follows; Main Building - two storey plain tile timber and flat roofed building with mixture of solid and suspended timber floors. First floor is timber suspended. Isolated Garage - timber framed with corrugated galvanised cladding to walls and roof. Internal cladding T & G timber boarding Garage is built into earth bank approx. 750mm deep. Two Rear gardeners sheds- mixture of block and timber single storey sheds with felt timber flat roofs Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- GB-Swanage: Demolition of Everest Building at Swanage Hospital
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 14 Nov 2016
- Work ends
- 16 Dec 2016
Who the buyer named
David Barratt was the named contact on this notice.
