Demolition shall include for the total removal of existing buildings as follows;  Main Building - two storey plain tile timber and flat roofed building with mixture of solid and suspended timber floors. First floor is timber suspended.  Isolated Garage - timber framed with corrugated galvanised cladding to walls and roof. Internal cladding T & G timber boarding Garage is built into earth bank approx. 750mm deep.  Two Rear gardeners sheds- mixture of block and timber single storey sheds with felt timber flat roofs Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

A Hammond & Sons Ltdends (16 Dec 2016)

Details

What the buyer calls it
GB-Swanage: Demolition of Everest Building at Swanage Hospital
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
14 Nov 2016
Work ends
16 Dec 2016

Who the buyer named

David Barratt was the named contact on this notice.