Skip to the main content
The Crier

GB-Swanage, Dorset: Demolition of Everest Building at Swanage Hospital

Your saved contracts

What the buyer wrote

Demolition shall include for the total removal of existing buildings as follows;  Main Building – two storey plain tile timber and flat roofed building with mixture of solid and suspended timber floors. First floor is timber suspended.  Isolated Garage – timber framed with corrugated galvanised cladding to walls and roof. Internal cladding T & G timber boarding Garage is built into earth bank approx. 750mm deep.  Two Rear gardeners sheds- mixture of block and timber single storey sheds with felt timber flat roofs Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, …

Read all of it on Contracts Finder →

Details

What the buyer calls it
GB-Swanage, Dorset: Demolition of Everest Building at Swanage Hospital
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
28 Aug 2016
Work ends
30 Sep 2016

Who the buyer named

David Barratt was the named contact on this notice.

david.barratt@dhuft.nhs.uk