GB-Wimborne: DH370 Victoria Hospital Electrical Switchgear
What the buyer wrote
NOTE: This notice was updated on 15 June 2016 for the following reason: Estimated value increasedThe project comprises the removal and replace obsolete main switchgear and generator controls that serve the entire Hospital along with the replacement of associated sub-main cabling along with the provision of metering to sub-mains and major loads. The works are located within the existing ground floor switchroom. The provision of temporary supplies and shutdowns is necessary to complete the Works. The Contract period will be as shown in the draft programme including Appendix D. (The Works will be undertaken in Phases). Additional information: The contracting authority considers that …
Details
- What the buyer calls it
- GB-Wimborne: DH370 Victoria Hospital Electrical Switchgear
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 10 Jul 2016
- Work ends
- 1 Sep 2016
- Kind of work
- New build construction, Clinical and healthcare services
Who the buyer named
David Barratt was the named contact on this notice.