Skip to the main content
The Crier

GBC VH Design and Build of the Walnut Pedestrian Bridge, Guildford Town Centre

Your saved contracts

What the buyer wrote

Introduction 1.1.1 Guildford Borough Council, in partnership with Surrey County Council and the M3 Local Enterprise Partnership wishes to replace Walnut Bridge in the centre of Guildford. The existing bridge is narrow and has a western entrance that is hidden within an existing building, so that only those with local knowledge know of the bridge's presence. A new bridge structure will also act as a catalyst for the regeneration of the Bedford Wharf site. This pedestrian and cycle bridge forms a vital link between the Railway Station and the Town Centre. 1.1.2 The bridge forms a key component of the Guildford Town Centre Transport Package, with the remai…

Read all of it on Contracts Finder →

Details

What the buyer calls it
GBC VH Design and Build of the Walnut Pedestrian Bridge, Guildford Town Centre
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
18 Apr 2018
Work ends
5 Sep 2019

Who the buyer named

Ian Roadnight (WSCC) was the named contact on this notice.

ian.roadnight@westsussex.gov.uk