GBC Weyside Urban Village Infrastructure Phase Two
What the buyer wrote
The project includes the Phase 2 infrastructure works to enable the main construction project works. Early Works (indicative, to be confirmed during ECI) include:- Strip relevant part of site of vegetation- Remediation of area- Site platform and Levelling site to established levels- Installing ducting as required along cable route- Create haul road to service substation siteMain works include:- Vegetation clearance, tree felling and site strip- Topsoil stripping- Sitewide remediation of contamination- Site platform and levelling- Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors- Swales and attenuation basins- Surface water outfalls, headwalls- Utility in…
Details
- What the buyer calls it
- GBC Weyside Urban Village Infrastructure Phase Two
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Where
- in the South East
Who the buyer named
Gavin Pugh was the named contact on this notice.
