The proposed works involve removing the existing Upstream and Downstream steel parapets and replacing them with reinforced concrete parapets. Additionally included works are concrete return walls at the downstream parapet to tie the parapet to existing RC retaining walls and any works associated

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

William Pye Limited£19.6kends (19 Aug 2016)

Details

What the buyer calls it
George Street Bridge - Parapet Replacement Works
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
12 Jul 2016
Work ends
19 Aug 2016

Who the buyer named

Peter Hughes was the named contact on this notice.