Glasshouses Bridge Maintenance Repainting Scheme
What the buyer wrote
All failed and loose coatings and corrosion products are to be removed by hand tool cleaning to St3. Tightly adhering sound paint is to be cleaned with water. All parapets and structural steelwork to be repainted with compatible chlorinated rubber paint, colour as existing Green 14-C-39. All bearings are be painted with a 115, 116, 168 system. Colour- as existing- Green 14-C-39 Access for painting is to be by suspended scaffold and only half of the river channel is to be scaffolded at any time. Traffic management- Glasshouses bridge is to remain open to vehicles and pedestrians throughout the duration of the works. Protection of Statutory Undertakers Apparatus Provision of welfare fac…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Glasshouses Bridge Maintenance Repainting Scheme
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Feb 2017
- Work ends
- 31 Mar 2017
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Hannah Benson was the named contact on this notice.