Skip to the main content
The Crier

Golborne Railway Bridge, No. 010, East Lancashire Road (A580), Golborne – Major Structural Maintenance Works -2015 (Revised Scheme)

Your saved contracts

What the buyer wrote

The structural maintenance works comprises: Exposing the concrete bridge deck under the carriageway, Removal exposing waterproofing membrane, Installation of hybrid electrochemical protection system (Cathodic protection with sacrificial anodes), construction of ballast wall, undertake concrete repairs using polymer modified cementitious repair mortar, replacing the bridge buried joints, re-waterproofing of the bridge deck and road resurfacing works.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Eric Wright Civil Engineering Ltd£277.8kends (20 Dec 2015)

Details

What the buyer calls it
Golborne Railway Bridge, No. 010, East Lancashire Road (A580), Golborne – Major Structural Maintenance Works -2015 (Revised Scheme)
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Work starts
11 Oct 2015
Work ends
20 Dec 2015

Who the buyer named

Mr. Steve Wearing was the named contact on this notice.

S.Wearing@wigan.gcsx.gov.uk