Skip to the main content
The Crier

Green Belt and Open Land Assessment

Your saved contracts

What the buyer wrote

The Royal Borough of Kingston upon Thames (the 'Council') is preparing a Local Plan to guide future development in the borough until 2041. As part of the process of developing a Local Plan, it has begun gathering evidence to inform key land use planning issues. 32% of the borough is designated as either Green Belt or Metropolitan Open Land (MOL), collectively amounting to some 1,184 hectares. This forms part of the Metropolitan Green Belt and London-wide MOL network. The National Planning Policy Framework (NPPF) explains that the Green Belt designation aims to prevent urban sprawl and keep land permanently open and the London Plan explains that the NPPF's Green Belt policies should apply …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Amec Foster Wheeler£21.6kends (30 Nov 2017)

Details

What the buyer calls it
Green Belt and Open Land Assessment
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Work starts
9 Apr 2017
Work ends
30 Nov 2017

Who the buyer named

Niamh Riordain was the named contact on this notice.

niamh.riordain@kingston.gov.uk