GWH19 - Demolition of Hawthorn Avenue

Your saved contracts

What the buyer wrote

The work comprises the demolition of 29no dwellings situated off Hawthorn Avenue, Hull. Dwellings are in blocks and are of a traditional brick build. It is assumed the properties are built on strip foundations, demolition is to include both the superstructure and sub structure down to a depth of 1 metre and include all pipework and drainage within the perimeter of the site. Post demolition the site will be backfilled with clean imported sub-soil to ground level. The existing boundary walls to the perimeter of 35 Stirling Street shall be re-built and newly exposed gable brickwork shall be repaired to ensure integrity is maintained.

Details

What the buyer calls it
GWH19 - Demolition of Hawthorn Avenue
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
21 Jul 2019
Work ends
6 Sep 2019