Haddlesey Bridge Works

Your saved contracts

What the buyer wrote

Haddlesey Bridge requires its abutment and half joint bearings to be replaced by stainless steel bearings. The works will require jacking the bridge to get the existing bearings out. The abutment bearings will need to be removed by breaking out the existing stone wall and concrete abutment as there is approx. a 50mm gap for access, which isn't adequate. The works also require designing temp works for the piers in order to utilise the jacking operations at the half joints. Where the half joints are, there is localised corrosion which will require spot blasting to SA2.5. This will also then require a primer and top coating being applied to the steelwork. On the top side of the bridge, there …

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

PBS Construction (North East) Ltd£445.1kends (8 Oct 2018)

Details

What the buyer calls it
Haddlesey Bridge Works
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
15 Jul 2018
Work ends
8 Oct 2018