Hammersmith Bridge Strengthening and Refurbishment Works - Stages 2 Feasibility Study & 3 Preliminary Design
Transport for Londonservices
What the buyer wrote
Technical Consultancy for Hammersmith Bridge Strengthening and Refurbishment Works - Stages 2 Feasibility Study & 3 Preliminary Design
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Hammersmith Bridge Strengthening and Refurbishment Works - Stages 2 Feasibility Study & 3 Preliminary Design
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Work starts
- 30 Oct 2017
- Work ends
- 30 Jul 2018
Who the buyer named
Vikram Gudra was the named contact on this notice.
